Job Allowance - Updated 22 July 2008
Job allowance time is included for all assessments.
- For some vehicle manufacturers the job allowance is included within the main operation time and therefore will not be shown separately on the report
- Where the job allowance is not included within the main operation time, a separate time will be displayed on the report, in one of two ways, as shown below:
- As a KN number, click here to view screen grab

- As a manufacturer operation code, click here to view screen grab

Back to general FAQ page